Adria Mobil – Slovenia

Project statistics

Comfortable working conditions for employees

Greatly improved productivity on hot days

Situation before the contract and client requireme

The client had no built-in comfort cooling in the production hall and used natural gas to heat the production hall.

Required cold: 460 MWh annually.

Required heat: 510 MWh annually.

The client wanted the highest level of savings.

Resalta solution

Analysis of the existing ventilation system and preparation of an energy efficient solution: reversible air/water cooling unit with integrated hydraulic module and high efficiency.

A reversible high efficiency heat pump was installed with a cooling capacity of 310 kW and a heating capacity of 340 kW (under Eurovent conditions).

Želite li vidjeti još?

Preuzmite naše studije projekata.

Uvjeti.

Pretplatom na naš newsletter pristajete primati e-mail poruke od Resalta d.o.o. Cilj našeg newslettera je informiranje posjetitelja Internet stranice, partnera, klijenata i opće javnosti o radu Resalte, njihovim novim projektima, razvoju događaja, predstojećim događajima te vijestima o energetskoj učinkovitosti i obnovljivim izvorima energije. Učestalost slanja newslettera bit će najviše mjesečna, uz moguće iznimke za neplanirane ali važne vijesti. Zadržavamo isključivo pravo da izmijenimo ili prekinemo newsletter, u bilo koje vrijeme i bez prethodne obavijesti. Smatramo vašu privatnost ozbiljno i nikada nećemo komunicirati ili prodavati vaše podatke trećim stranama. Možete se odjaviti s newslettera u bilo kojem trenutku.