Hotel Salinera

Project statistics

Reduction of heating costs by

37

%

500

t

annual reduction of CO2 emissions

Situation before the contract and client requirements

The hotel was facing high energy expenses and an obsolete heating system that needed to be renovated; it needed to operate without interruptions.

The client was looking for a contracting partner with experience in energy solutions and financing.

Resalta solution

Resalta undertook a hydraulic reconstruction of the existing boiler room and installed a reversible heat pump sea water/water. This was connected to the existing pumping station and in addition new pipe connections were installed between the heat pump and the boiler room.

Resalta signed a contract for the energy supply of cooling and heating energy to the client.

Želite li vidjeti još?

Preuzmite naše studije projekata.

Uvjeti.

Pretplatom na naš newsletter pristajete primati e-mail poruke od Resalta d.o.o. Cilj našeg newslettera je informiranje posjetitelja Internet stranice, partnera, klijenata i opće javnosti o radu Resalte, njihovim novim projektima, razvoju događaja, predstojećim događajima te vijestima o energetskoj učinkovitosti i obnovljivim izvorima energije. Učestalost slanja newslettera bit će najviše mjesečna, uz moguće iznimke za neplanirane ali važne vijesti. Zadržavamo isključivo pravo da izmijenimo ili prekinemo newsletter, u bilo koje vrijeme i bez prethodne obavijesti. Smatramo vašu privatnost ozbiljno i nikada nećemo komunicirati ili prodavati vaše podatke trećim stranama. Možete se odjaviti s newslettera u bilo kojem trenutku.